Confirmed: Chief of the GBTU USA, Major General of the Tank Engineering Service, Alymov
Plan of the 3rd Department of the GBTU USA for April-May 1944
Work 
 | 
  
Executor 
 | 
  
Due date 
 | 
 
Controlling the completion of 100 mm D-10S gun installation into the
  SU-100 at factory #9 and the Uralmash factory. 
 | 
  
Konev 
 | 
  
May 1st, 1944 
 | 
 
Organizing and performing large scale trials of the SU-100 from the
  first batch. 
 | 
  
Konev 
 | 
  
June 1st, 1944 
 | 
 
Taking part in SU-152M trials with an OBM-143 gun and giving
  conclusions. 
 | 
  
Ryabtsev 
 | 
  
May 1st, 1944 
 | 
 
Controlling the installation of and participation in trials of the
  122 mm high power gun into the ISU. Giving conclusions. 
 | 
  
Ryabtsev 
 | 
  
May 15th, 1944 
 | 
 
Controlling the production and testing of the 85 mm high power gun. 
 | 
  
Konev 
 | 
  
June 1st, 1944 
 | 
 
Organizing and execution of trials of the SU-85 (GAZ). Giving
  conclusions. 
 | 
  
Volgushev 
 | 
  
May 15th, 1944 
 | 
 
Controlling experimental work at factory #38: 
 | 
  ||
·        
  Testing the installation of the 122 mm
  howitzer into the SU-76M 
 | 
  
Afanasenkov 
 | 
  
May 15th, 1944 
 | 
 
·        
  Correction of defects of the SU-37 discovered
  during proving grounds trials. 
 | 
  
Vasilevskiy 
 | 
  
May 1st, 1944 
 | 
 
·        
  Organization and execution of SU-37 trials
  after the prototype is improved. Giving conclusions. 
 | 
  
Vasilevskiy, Volgushev 
 | 
  
May 20th, 1944 
 | 
 
Organization and execution of proving grounds trials of the SU-37
  produced by factory #40. Giving conclusions. 
 | 
  
Vasilevskiy, Volgushev 
 | 
  
May 15th, 1944 
 | 
 
Via Yuri Pasholok.