Showing posts with label Object 212. Show all posts
Showing posts with label Object 212. Show all posts

Monday, 24 April 2017

Kirov Experiments, June 1941

"Report on completion of experimental works on armoured vehicles from May 20th, 1941, to June 20th, 1941

Object 220 (KV-3 base)

As of June 20th, the tank traveled 1979 km in total, 584 km after reassembly. The 850 hp V-2SN engine #2(1193-03) installed on May 30th worked for 27 h. 21 m. During trials, the following defects were discovered:
  1. 3 sets of exhaust collectors burned up over the course of 284 km.
  2. 4 final drive ferodo ribbons burned up. Cause: improper installation and adjustment.
As of June 12th, the existing defects are:

Monday, 27 February 2017

Kirov Factory Prototypes, March 1941

"Report on the progress of experimental tank armament work from February 20th to March 20th, 1941

Object 220 KV-4 100 mm
The experimental prototype is awaiting the arrival of the V-5 engine from the subcontractor factory. Assembly of the second prototype has not started due to a lack of finished parts. The factory already began producing parts for the second prototype. The parts are in the initial stages of mechanical production. Since the plants are highly loaded with mass production parts, it is likely that the full set of parts for the prototype will not be finished in March. The turret for the second prototype is currently at factory #92, where designers from both factories are working on installation of the gun and combat equipment.

Wednesday, 22 February 2017

Heavy Tank Costs

"To the Chief of the BTU, Military Engineer 1st Grade, comrade Korobov

Following decrees issued by the Government, the Kirov factory is building a series of experimental vehicles without having any contracts for them. Letter #6109 sent on November 15th, 1940, asked you to send these contracts. Letter #2239/s sent on February 20th, 1941, repeated the request. Nevertheless, we have not received any contracts from you.

I am sending you a report of the approximate cost of experimental works performed by the Kirov factory in 1941 regarding Objects ##150, 220, 221, 212, and KV-3, for the sum of 5,350,000 rubles in total. Please send us the information to issue bills regarding these projects.

Sunday, 10 July 2016

SPG #212: Pillbox Hunter

The war between the USSR and Finland that broke out on November 30th, 1939, revealed a ton of deficiencies in the organization and management of the Red Army. Naturally, questions regarding materiel also arose. It was finally clear that the Red Army needs tanks that can withstand cannons. The need for a specialized SPG that could destroy fortifications was also obvious. The KV-2 was one such vehicle, and even had time to fight the Finns, but it was destined to be replaced by the 212 SPG with an even more powerful gun.

Sunday, 23 February 2014

World of Tanks History Section: Object 212

The history of domestic SPGs began in September of 1931. During work on a "self propelled corps triplex", SU-7 and SU-14 SPGs were developed. SU-7 was designed to use a 152 mm gun, 203 mm howitzer, and a 305 mm mortar. The SU-14 was designed to use a 107 mm gun, 152 mm gun, and a 203 mm howitzer. After the arrests of N.N. Magdeisev (designer of the B-4 howitzer) and then P.I. Syachintov, who was in charge of the SU-14 project on August 7th, 1938, the "small triplex" was cancelled.

High powered SPGs came up again in late 1939. While storming the Mannerheim Line, the Red Army needed an SPG with a high caliber gun and at least light anti-shell armour. In the middle of December of 1939, the Kirov factory and factory #185 design bureaus received an order from the Military Council of the North-West Front to develop engineering tanks with anti-shell armour. Factory #185 started two projects at once. Work began on an SPG based on the T-100. Additionally, it was decided to equip the SU-14 with armour. You would assume that the already made SPG was the faster solution, but no, work only competed on March 20th, a week after the end of the Winter War. The creation of an SPG on the T-100 chassis was not fast either, resulting in a vehicle named T-100Y, armed with a 130 mm B-13 naval gun.

The Kirov factory took a different route. In January of 1940, a prototype of the KV heavy tank (serial number U-0) arrived from the front. According to orders from the Military Council of the North-West Front, the first 4 tanks, including U-0, were to be equipped with 152 mm howitzers to defeat pillboxes. An enlarged turret was rapidly developed as a result. Work on the enlarged turret was done by SKB-3, headed by N.V. Kurin. Initially, the 152 mm model 1909/30 howitzer was planned, indexed L-21. In metal, the assault KV was equipped with a shortened M-10 (indexed MT-1). By February 10th, the new U-0 passed gunnery trials, and by February 17th, U-0 and U-1 were sent back to the front. "KV with large turret" tanks first saw battle on February 22nd. By March 3rd, there were 4 tanks of this type on the front lines.

Due to the results of the Winter War, it was decided that the "bunker buster" theme would be continued. During the spring and summer of 1940, the Kirov factory and factory #185 continued designing heavy SPGs on the T-100 and SMK chassis. However, the final fate of these vehicles was decided by the end of June. Based on the results of trials, it was clear that neither tank will be mass produced, since the KV was more protected and weighed less. The "KV with a large turret" was an adequate interim solution for the bunker buster problem.

As mentioned above, the "KV with a large turret" was a temporary answer to the need for a heavy assault SPG. Kurin's tank was a hypertrophied support tank like the artillery BT-7 (frequently called BT-7A, but that index belongs to another tank). The vehicle on the KV chassis (indexed KV-2 in 1941) had the advantage of parts commonality with its base vehicle. However, it had many drawbacks. The chassis allowed for a limited power gun, while the military demanded that the Br-2 gun be used. Due to the limited size of the turret, loading the M-10T was no easy task. The presence of a rotating turret did not mean that the tank could shoot from any angle.

After the SMK and T-100 projects died, efforts were concentrated on the creation of a heavy tank that was a modernized KV. On July 17th, 1940, the Committee of Defense of the Council of People's Commissars issued decree #198ss on the creation of new vehicles on the KV chassis. According to the decree, the Kirov factory was to develop the following:

  • Two experimental KV tanks (T-220) with 100 mm armour. One was to be armed with the F-30 85 mm gun, the other with the F-32 76 mm gun.
  • Two experimental KV tanks with 90 mm armour. One was to be armed with the F-32 76 mm gun, the other with the F-30 85 mm gun.
  • One experimental SPG with a Br-2 152 mm gun. 
The KV with 90 mm of armour received the factory index "150" (GABTU correspondence used the index T-150). It differed from its base vehicle in its 76 mm F-32 gun and a commander's cupola. It was planned that this tank, under the index "KV-3" will replace the KV-1.

The "220" tank was more distinct from the KV-1. The tank had a longer hull; the amount of road wheels increased to 7 on each side. The T-220 had a new turret, which housed the 85 mm F-30 gun. The tank used an 850 hp V-2F (V-10) engine. It was completed on December 5th, 1940.

The technical requirements for the 152 mm SPG were finalized by the end of August of 1940.

The SPG that the Kirov factory was tasked with received the index of "212". The chief engineer for this project was T.N. Golburt. The 212 was reminiscent of the SU-14-1, especially when it came to the layout of the fighting compartment. The chassis was a reworked T-220 suspension, with an engine in the middle and drive wheels at the front. The front also housed the driver's compartment. The fighting compartment was in a large casemate at the rear of the hull. On one hand, this design increased the size of the SPG. On the other, it increased crew comfort. The rear position of the casemate also reduced the distance that the Br-2 stuck out past the vehicle's hull.

2 million roubles were issued to this project. 100,000 went into the development of the technical project, 25,000 to the design of a model, 300,000 on blueprints, 75,000 on blueprint edits, 1.1 million on the production of a prototype, 100,000 on trials, and then 300,000 on repairs. The cost of the armament was not included in this sum.

The first prototype was due on December 1st, 1940, but serious corrections had to be made due to faults found during the design process. According to a GABTU report on experimental works, some components for the 212 were produced by January of 1941. Also, the technical project was completed, and sent to the Izhor factory for the production of a hull. By then, 1.5 million roubles have been spent. Work was going slowly due to higher priority of the T-150 and T-220, as well as other problems.

The hull for the new SPG was received only on March 5th, 1941. According to reports, assembly was stalled due to a lack of ready components. By the spring of 1941, the 212 project was dropping in priority at the Kirov factory. The factory received an urgent order for a heavy tank that inherited the T-150's index of "KV-3". The project, indexed "223", was developed on the T-220 chassis, with a front plate thickened to 120 mm and a new turret for the 107 mm ZiS-6 gun. The mass was estimated at 68 tons. The design of this vehicle began after learning of a new German heavy tank. Due to this load, work on the 212 stalled starting in the second half of March of 1941. April and May reports on experimental work state "No changes" in the row titled "self-propelled gun on the KV chassis". 

After Germany's attack on the USSR, designs were reconsidered. Work on some designs was accelerated. Others, either in the initial stages or not compatible with the realities of modern war, were cancelled. According to the most common version of this story, this was the fate of the 212, but it did not happen quite this way.

According to order #253ss of the People's Commissariat of Heavy Production, the KV-3 was transferred from the Kirov factory to the Chelyabinsk Tractor Factory (ChTZ). Engineers, technologists, and materials were sent to Chelyabinsk. One KV-3 made it to the front, another, without a turret or components, was sent to Chelyabinsk. In February of 1942, this KV-3 was assigned to the experimental OP-2 plant. As for the 212, until the start of August of 1941, it was still at the Kirov plant. Only then was it transferred to the Ural Factory of Heavy Machine Building (UZTM in Sverdlovsk, modern Ekaterinburg). 

Meanwhile tank production had no time for the KV-3, nor a bunker buster on its chassis. The Kirov factory was evacuated to Chelyabinsk and renamed Kirov Factory in Chelyabinsk (ChKZ), and the Izhor factory that made KV armour was sent to Sverdlovsk. UZTM was renamed to Izhor factory, and only got its name back on January 4th, 1942. UZTM was also loaded with Ordzhonikidze factory #37 and Kalinin factory #8 setting on up its territory. Factory #75, which was producing the V-5 engine was moved to Chelyabinsk, and began working on the much more necessary V-2. The situation with 152 mm guns was no better. The last Br-2 was produced by Barricade factory #221 (Stalingrad, modern Volgograd) in 1940.

Bunker busters fell out of priority, but not for long. In November of 1941, work restarted on many prototypes referred to in the SNK report "On self-propelled artillery" from May 27th, 1941. Nearly all of these projects remained in the requirements stage until 1942, there was not even a possibility of a design. Most factories tasked with designing the SPG were either busy with setting up manufacturing in the buildings where they were evacuated to in the summer and fall, or loaded with more urgent requests. Nevertheless, the list of experimental works for 1942 once again included the KV-3, scheduled for completion on May 1st, 1942. The same was true for a "two-stroke 1200 hp diesel engine" (due on October 1st, 1942), "charging the V-2 engine to 1200 hp" (due on July 1st, 1942). In March of 1942, the topic of "152 mm SPG on the KV-3 chassis (bunker buster)" resurfaces. The KV was indicated as its chassis, and the oscillating part of the Br-2 its armament. Factory #100 was listed as responsible for the chassis. Factory #8 was responsible for the gun. 1.5 million roubles was issued for this project. A prototype was expected by July 1st, 1942. However, the KV-3 was dead and buried in spring of 1942, and different vehicles were considered candidates for a bunker buster chassis.

Read more about the Object 212 and other SPGs on the KV heavy tank chassis in the book "SU-152 and other KV-based SPGs", published by Tactical Press.

Article author: Y. Pasholok.

Original article available here

Monday, 18 November 2013

Soviet Experimental SPGs

When the Red Army encountered Finnish defenses during the Winter War, they realized that they had no self propelled guns capable of defeating concrete fortifications. Using the chassis of the three new heavy tanks (SMK, T-100, and KV), new self propelled artillery projects were developed. The only one of them that really got anywhere was the KV-2. Various other projects, such as the 212 SPG (known to many more as Object 212) got somewhere before slowly dying due to a sudden lack of an enemy with fortifications they would be needed against.

CAMD RF 38-11355-101

"Act on the state of completion of the object #212 (SPG)

The current act is composed to state that the following work was performed on the experimental object #212 (SPG) as of May 29th, 1941.
  1. Sketches and technical project, costing 100,000 rubles.
  2. Working blueprints, costing 200,000 rubles.
  3. Armoured hull produced at the Izhor factory, costing 150,000 rubles.
The total cost of the work was 450,000 rubles, which is the sum that must be paid in advance to the project. The final cost will be computed using report calculations.

Lantzberg, Kotin, Rogachev, Shpitanov"

However, the project stalled way before May. The SPG has been sitting in that condition since March. Soon after this document was written, the war started, and the 212 was shuffled around from factory to factory, eventually disappearing forever. 

Work on a self propelled high caliber howitzer had to be put on hold, but the artillery officers never forgot about it. Eventually, the Artillery Committee ordered it back up and running. Item #12 on a list of projects at the Kirov factory (CAMD RF 38-11369-91) contains the following:

"203 mm self propelled B-4 howitzer on the chassis of a KV-1S tank. Kirov Factory and factory #172. Planned work for the Artillery Committee.

The Artillery Committee planning session from April 15th, 1942, identified the need for a self propelled Br-2 gun on the KV chassis. As a result of experience in the construction of self-propelled guns in 1942-1943, it was deemed possible to install a B-4 howitzer in a semi-enclosed SPG. The Kirov factory and factory #172
have a contract with Artkom's 16th department regarding this project. Each factory is developing the project separately."

The need for a Br-2 on a KV chassis appears even earlier, in a document from November of 1941 that lists SPG projects for 1942 (CAMD RF 81-12104-115).

In November of 1943, the GAU chief, Colonel Yakovlev, wrote a letter to the People's Commissar of Tank Manufacturing Malyshev:

"According to your announcement, the Commissariat of Tank Manufacturing intends to continue work on design and production of experimental self propelled 152 mm Br-2 and 203 mm B-4 guns, which was ordered by the GAU in 1940, but was interrupted in 1941 due to the start of the war.

The GAU considers this work to be necessary. The blueprints for the guns and ammunition have been sent to the Kirov Factory SKB-2 by GAU on June 19th of this year.

Orders to deliver a 152 mm Br-2 gun and 203 mm B-4 howitzer to factory #100 have been given.

The technical requirements, revised based on experience of the war, are currently being completed at GAU and will be sent to you in the coming days."

CAMD RF 81-12063-1

That desire was fulfilled in less than a year, in the form of the S-51 self-propelled howitzer. Unlike the previous designs, where the gun was fully enclosed, the S-51 mounted it on a mostly open platform, with a shield in the front that could flip up to protect the crew from shrapnel and bullets.

"An Order of the State Committee of Defense

On the question: manufacturing a party of 203 mm self propelled howitzers B4-S51

The Red Army accepts the 203 mm B4-S51 howitzer, developed by TsAKB NKV, consisting of the 203 mm B-4 field howitzer model 1931 on a KV-1S tank chassis.

NKTP (comrade Malyshev) and GURT of the Red Army (comrade Sosenkov) must deliver 50 repaired KV-1S tanks to NKV, without the rotating turret, and with an intact suspension, engine (with less than 10% of its lifetime hours expended), transmission, and spare parts by the following dates:
  • 25 units by August 10th
  • 25 units by August 25th
NKV (comrade Ustinov) must manufacture parts and organize mass production of 203 mm B4-S51 howitzers in the following time frame:
  • By August 20th: 20 self propelled howitzers
  • By August 30th: 30 self propelled howitzers
During mass production, remove the defects discovered during trials. TsAKB NKV (comrade Grabin) must edit the blueprints accordingly, and turn them in by August 1st to GAU of the Red Army."
CAMD RF 81-12038-413

CAMD RF 38-11369-287

"The 203 mm self propelled "S-51" howitzer built by the NKV TsAKB, consisting of a 203 mm model 1931 howitzer (B-4) on a turretless KV-1S tank with a foundation plate for the installation of the rotating part of the howitzer and slots cut in the roof of the hull for the recoil mechanisms underwent trials. The main technical-tactical characteristics of the self propelled S-51 howitzer are as follows:
  1. Ballistics
    1. Caliber: 203.2 mm
    2. Muzzle velocity: 607 m/s
    3. Maximum chamber pressure: 2366 kg/cm^2
    4. Shell mass: 100 kg
    5. Muzzle energy: 1900 ton-meters
    6. Maximum range: 18025 meters
  2. Combat
    1. Vertical range: 0-60 degrees
    2. Horizontal range: +/- 4 degrees
    3. Ammunition capacity: 12 rounds
    4. Rate of fire: 1-1.5 RPM
    5. Full combat weight (according to TsAKB data): 49.7 tons
    6. Crew: 10
    7. Maximum speed: 30 kph
  3. Design
    1. Bore axis height: 2793 mm
    2. Recoil length:
      1. Long (up to 16 degrees 30 minutes): 1200-1300 mm
      2. Short (from 16 degrees 30 minutes and up): 850-890 mm
    3. Initial pressure in return gear: 40+/-2 atmospheres."
In the meantime, GAU Artkom was developing their own 203 mm SPG at Perm (factory #172). The vehicle, indexed M-22, was very similar to the S-51: a SU-152 with the casemate removed, and B-4 howitzer added.

CAMD RF 38-11369-108

Thankfully, sane artillery projects were also being developed at the time, such as a SU-76 with a 122 mm howitzer, to make a more portable and cheaper SU-122. 

CAMD RF 38-11369-481

"May 1944
To the director of the Gorkiy Automotive Factory

I ask you to order the Construction Bureau to explore the possibility of installing a 122 mm howitzer in an SPG on the chassis of the SU-76.  In order to obtain the tactical-technical characteristics of the 122 mm howitzer, contact the Construction Bureau of the NKV factory #9 in Sverdlovsk. 
Report back on your decision and subsequent actions.

Chief of the GBTU KA
Lieutenant-General of the Tank Forces
Vershinin"

The exact date of the above document was cut off in the scan, but seeing as how all the other stamps and signatures on it are from June, it was likely late May.