Showing posts with label ARL 44. Show all posts
Showing posts with label ARL 44. Show all posts

Sunday, 20 March 2016

The Last of the Char B

There is a misconception that the French worked only for their new masters during the occupation of 1940-1944. Indeed, most French tank manufacturing facilities ended up in the German occupation zone. Nevertheless, the resistance that so many speak of was active, and even on occupied territories, work continued. It became the foundation for French tank building that began immediately after the country was freed from occupants.

Results of Quiet Work

It just so happened that the main secret developers of French tanks were involved in the creation of the best French wartime tank, the Char B. Forges et Chantiers de la Méditerranée (FCM) ended up outside of the occupation zone, but Ateliers de construction de Rueil (ARL) ended up inside of it. Until 1936, this organization was the tank building branch of the APX arms manufacturer.

Aside from the Char B, both companies worked on modernization of the breakthrough tank. Here the B1 ter prototypes were developed and produced, and work on the improved B40 tank began. In addition, both companies were competing for the contract of making a superheavy tank for the Maginot Line. Prototypes were ordered and full scale models built.

During the occupation, work at FCM and ARL slowed down, but didn't stop. Outside the occupation zone, work to modernize the Somua S35 cavalry tank continued. FCM engineers developed two and three man turrets with a more powerful 47 mm gun. As for ARL, they went even further. In 1942, the design bureau performed a deep modernization of the Somua S35, indexed SARL 42 (Somua-ARL 42).

The design of the hull was changed: the front was sloped more, the radio operator's position was removed, the hull was simplified. Another change was a new turret ring: 1500 mm wide opening, 1580 mm wide base. A new three man turret was designed from scratch, to be equipped with a 75 mm L/53.3 gun. The work was split up: the SARL 42 hull was developed in Rueil-Malmaison, supervised by the chief engineer of ARL Maurice Lavirotte. The turret was designed by engineer Devenne's grop in Caussade, outside of the occupation zone. Also in Caussade, Lafargue's group was working on the gun, based on a 75 mm Schneider AA gun.

After the Germans occupied the rest of France in the fall of 1942, work on SARL 42 stopped. ARL engineers were also working on a 30 ton tank that continued the Char B lineage, but this work was stopped in November of 1942. However, this was not in vain: the engineers received priceless experience that will come in handy two years later.

In August of 1944, Paris was liberated, and by fall, most of France was free of occupants. Almost immediately after liberation, companies resumed work on new tanks. Vast trophies supplemented their own experience. Even though most vehicles in France were hopelessly outdated, the Allies did run into a few hundred Panthers and a few heavy Tiger battalions. In addition, France saw the combat debut of the Tiger B, and the majority of these new tanks from the 503rd Heavy Tank Battalion remained in the fields of Normandy. The aforementioned vehicles, especially the Tiger B, played an important role in restoring French post-war tank production.

Growth of Appetites

On October 9th, 1944, Lieutenant General Leier, the Chief of Staff of the French Army, signed an order for the development and production of new vehicles. The first section listed 150 Panhard 178 armoured cars armed with 47 mm guns, later expanding to Panhard 178B.

The second section is what interests us most. It describes a 35 ton tank armed with a 75 mm gun and a 500 hp Talbot engine with the armour of an American M4 Sherman. On November 29th, an new document was written. The Chief of Staff approved the characteristics of the new tank, and, most interestingly, the tank must be ready ASAP. It would enter production straight from the drawing board, without even a prototype! The production volumes were very ambition for a country just freed from occupation. Leier wanted no less than 500 tanks! The first vehicles were to be ready in May of 1945, with a monthly production run of 50-70 tanks.

There was a reason for such tight deadlines. The new vehicle was nothing more than an evolution of the Char B concept. The second gun was removed and the front plate was sloped at a high angle. The suspension was very similar to that of the Char B. The gun, indexed 75 mm SA Mle.1944 was effectively the same gun that Lafargue's engineers designed in Caussade in 1942. The AA gun whose ballistics it inherited penetrated 80 mm of armour from a kilometer away. This was enough to combat medium tanks, but was not enough for Tigers and Panthers. ARL understood this perfectly.

Blueprints of a Schneider designed turret armed with a 90 mm SA 45 gun.

In December of 1944, a proposal for a 90 mm tank gun based on the CA Mle 39 S was made.This gun, capable of penetrating 90 mm of armour from a kilometer away, was considered the most appropriate armament for superheavy tanks. Schneider started on the development of this new gun. On December 28th, 1944, it was decided that 300 of the 500 tanks would be armed with a 90 mm gun. However, mass production was delayed. The first 50 tanks were now expected on June 23rd, 1945.

Full scale ARL 44 model, built in the summer of 1945 at Renault.

The name for this new tank was first mentioned in a letter dated January 28th, 1945. It discussed the distribution of tasks in the production of the ARL 44. The 35 ton vehicle with up to 60 mm of armour was spread between two factories: Renault and FAMH (Forges et Aciéries de la Marine et d'Homécourt, better known as Saint-Chamond). By then, an alternative to the Talbot engine was proposed by Panhard. Production of 150 units was planned.

Production of components for the ARL 44 was planned to begin in February of 1945, and assembly would start in September. Renault would build 200 tanks, and FAMH would build 300. By now, the production schedule looked a lot more reasonable: REnault would produce 5 tanks in September, 10 in October, 15 in November, 20 tanks per month starting in December, and then 25 tanks per month starting in March of 1946. FAMH would make 7 tanks in September, 15 in October, 25 in November, and 30 tanks a month starting in December. The last 8 tanks of this type would be built in August of 1946.

ARL 44 as seen from above, July 6th, 1945

By then, Schneider, tasked with the development of a weapon for the new tank, was working on a more powerful weapon than the 90 mm gun. The gun, later indexed 90 mm SA Mle.1945S or 90 mm SA 45 S, was definitely inspired by the German 88 mm KwK 43 L/71. The length of the gun was 65 calibers, which increased the muzzle velocity to 1000 m/s and drastically increased penetration.

With this new gun, the ARL 44 became a dangerous enemy of any German tank. It was decided to use this gun instead of the tank version of the CA Mle 39 S. At the same time, the 75 mm version of the tank remained. This gun, installed in an ACL 1 turret developed by Ateliers de Chantiers de la Loire, was to be installed in initial production tanks.

The first ARL 44 prototype. The tank received the ACL 1 turret with the 75 mm SA 44 gun.

Due to rapidly changing requirements and a series of other reasons, production of the ARL 44 drew further and further away. Meanwhile, over the night of May 8th to May 9th, 1945, Marshal Keitel signed the act of surrender of Germany, and the war in Europe ended. France no longer had an urgent need for new tanks. At the same time, the French army's appetites grew once more. Rightfully assuming that 60 mm of armour wasn't enough for a modern tank, the thickness was doubled in February of 1945. The 35 ton vehicle gained weight, reaching way past 40 tons.

ARL 44 hull blueprints, February 1945. On the insistence of the military, the front armour was thickened from 60 to 120 mm.

The 90 mm SA 45 gun needed a new turret, which was designed by Schneider. Here, experience with superheavy tanks helped. The tank needed to be redesigned, since the perspective engines could no longer provide the tank with the necessary agility. Disappointed with these delays, the French military decreased the volume of their order to 150 tanks on May 23rd, 1945.

ARL 44 in production at the Renault factory, 1947-48.

On June 20th, 1945, Renault finally finished a full scale model of the ARL 44. The armour was indicated as only 60 mm, even though it was well known that the 120 mm variant was going into production by this point. The turret on this model was the Schneider type, equipped with a 90 mm SA 45 gun.

The mass of the tank was 48 tons, so it was decided that the German Maybach 230 TRM engine should be used. After Germany's surrender, France received a large amount of these 600 hp engines. A direct cooperation with Maybach also began. In addition, a Simca automobile engine was used to traverse the turret.

The gun could be turned backwards during travel to reduce overall length.

By the time the final ARL 44 version was approved, French defense companies joined into the DEFA consortium (Direction des Études et Fabrications d'Armement, later GIAT, since 1989, Nexter). This merger allowed centralization of work on the new vehicle. However, by August of 1945, a bid for tender was announced for the ARL 44's replacement. The military had few illusions about this tank. Work on the AMX 45 began in parallel with the ARL 44, which later became the AMX M4

A Post-War First

The first ARL 44 was ready by March 1st, 1946. As proposed, the tank received the ACL 1 turret and a 75 mm SA 44 gun. However, the idea of a batch of tanks with this gun disappeared by spring of 1946. First of all, work on a 75 mm gun based on the German 7.5 cm KwK 42 L/70 began. This gun was significantly more powerful than the French design. Second, it was obvious that a 75 mm gun on a tank of this size was silly. Emphasis shifted towards the 90 mm gun in the Schneider turret.

ARL 44 on trials.

Preparations for mass production began in April of 1946. As proposed, production was split between
Renault and FAMH. The first mass production ARL 44 was ready in June of 1946, two years after the initial production plan. By then, the order volume was cut even further: 60 vehicles. 20 would be built by Renault and 40 by FAMH. Documents reveal that the final split was different: 24 Renault tanks and 36 FAMH.

Mass production vehicle with a full equipment loadout. This included an AA machinegun on the commander's cupola.

The new vehicle was a costly one for French manufacturing. The ARL 44 only reached the army several years after the first tank was built. The first unit to receive these tanks was the 303rd Tank Regiment, which paraded through the streets of Paris on July 14th, 1951 with their new vehicles. By then, the ARL 44 was classified as a tank destroyer. Usage of the ARL 44 was accompanied by numerous breakdowns. A year later, the tanks were temporarily removed from service.

There is nothing more permanent that the temporary. In spring of 1952, AMX 50 tanks, an evolution of the AMX M4, entered trial service. It seemed that the new tank could replace the ill-fated pioneer. In addition, Pershing tanks started entering the French army in 1952, perhaps not as well armed, but a lot more reliable. The ARL 44 was already obsolete despite barely having served.

Debut of the ARL 44 at a parade on the anniversary of the Taking of the Bastille, July 14th, 1951. It just so happened that its debut was also its swan song.

Today, five tanks of this type remain, in various states. One of them can be found in the Saumur tank museum. Another tank is at the Mourmelon-le-Grand garrison. One vehicle, sans gun, is located at the Fontevraud garrison. Finally, two ARL 44s, which spent a long time as shooting range targets, were recently purchased by French collector Eric Kauffmann. His ASPHM association plans to restore both tanks. It will not be a simple challenge.

Wednesday, 20 January 2016

Third Reich Serving the Fourth Republic

After the end of WWII, French tank design was significantly influenced by their German colleagues. Their achievements are very well reflected in the design of the French AMX M4 heavy tank, the predecessor to the AMX 50. Even though the tank never reached production, it left its mark on tank building history. Here's how it all began.

Despite the occupation of France, French tank designers did not stop for even a minute. Work continued in strictest secrecy on both new tanks and modernizations of existing ones. Most progress came from Ateliers de construction de Rueil (ARL) from Rueil-Malmaison, west of Paris. In addition to an array of pre-war tanks, they also designed the SARL (Somua-ARL) 42 tank in 1942. In November of 1944, ARL began designing a heavy tank with experience of the SARL 42 and B1 ter tanks in mind. The designs of German tanks, especially the Tiger II, was also kept in mind. The first ARL 44 prototype was built in 1946.

The French military knew that this vehicle was only a temporary measure. Rapid developments in the field of armoured warfare rendered the ARL 44 obsolete even during its design phase. The suspension and design of the hull were more suitable for the early 1930s, maybe even mid 1920s. Neither 120 mm of front armour nor the Maybach HL.230 engine could bridge the gap. The military decided to keep the project open, but a competition for a new 50-ton medium tank began on July 31st, 1945. ARL did not participate, as work on the ARL 44 was in progress.

According to archive data, the following companies participated: Forges et Chantiers de la Méditerranée (FCM), Ateliers de construction d'Issy-les-Moulineaux (AMX), Lorriane, Somua, and... Renault. The last entrant is the most curious, especially since AMX was essentially the tank branch of Renault, nationalized in 1936. Aside from the fact that Renault participated in this contest, no information survives to this day; work did not even reach the project stage. FCM was also unlucky, and its 50 ton tank remained on paper. After more than 5 years of work, Lorraine and Somua produced prototypes of their projects (Lorraine 40t and Somua SM). Work got as far as designing and producing prototypes of SPGs on the Lorraine 40t chassis.

AMX was the luckiest. This company from suburban Paris worked on its 50 ton tank for almost 15 years, the project was changed several times, and SPGs were designed and built on its chassis. The tank never made it to mass production, but deserves a spot in history.

Draft of the Char A.M.X.45, drawing 0-1033 dated August 1st, 1945. Judging by the date, the work started even before the tender for the ARL 44's successor was officially announced. 

The characteristics of the AMX tank were similar to those of the ARL 44. The vehicle, indexed Char A.M.X. 45, was also referred to as NOM 141 (project 141). It was supposed to have 120 mm of front armour (50 mm LFP), 50-60 mm thick sides, 110 mm of front turret armour, and 30 mm thick turret sides. Like the ARL 44, the cast turret designed by DEFA (Direction des Études et Fabrications d’Armement, later reformed to GIAT, renamed Nexter in 1989) would house a 90 mm 65 caliber long Schneider gun with a coaxial 7.5 mm MAC Mle. 1931 machinegun. Another machinegun was placed in a ball mount in the front of the hull. The 47 ton tank would be put in motion by a German Maybach HL.230 engine. The tank looked like a Tiger II from the outside, but the French refused to place the transmission in the front. The transmission and drive wheels were in the rear from the very beginning of the project.

Design for installing the Swiss Saurer MP.65 engine into the Char A.M.X.45, dated August 28th, 1945. The engine, just like the tank, existed only on paper.

The first draft of the AMX 45 project is dated August 1945. By the end of the month, the project was radically altered for the first time. The new characteristics drove up the mass by 3 tons, to a total of 50 tons. The Maybach HL.230 was no longer satisfactory, as 700 hp was considered too little for such a heavy vehicle. High effective horsepower was considered very important, based on experience from WWII. Starting with blueprint 01041 dated August 28th, 1945, the tank obtained a 1000 hp MP.65 Sauer engine. The AMX 45 index disappeared, replaced by a new one: Char Moyen 50t M4 (50 ton medium tank M4). The name "AMX M4" stuck for five years, during which the project changed almost completely.

The AMX M4 turret. Compare it with the Tiger II's turret to see what engineers from DEFA were inspired by. Note that the turret ring diameter of the French tank was greater, which impacted a number of characteristics, such as crew comfort.

The Swiss engine didn't last long. It was not available in metal, and the engine is no less an important component of the tank than its gun. Not surprisingly, the Germans replaced the Swiss in this regard. Maybach ended up under French influence after the war, and mutually beneficial cooperation followed. Also, many German engineers, including Porsche, ended up involved with French tank design, willingly or otherwise.

If ARL 44 was the combination of existing components, the AMX M4 was a combination of all German late-war ideas. The E-50 and E-75 that are so beloved by fans of alternate history left their mark here. Recall that the E-50 was meant to have a rear transmission, and the Maybach HL.234, proposed as the power plant for the E-50 and E-75, evolved into the new AMX M4 engine. The HL.295, blueprints for which are dated September 1945, was an enlarged HL.234, giving 1000 hp at 2800 RPM. This was not just a proposal, it was really built in metal. Maybach engines also powered the Lorraine 40t and Somua SM tanks. As for the AMX M4, the HL.295 first appeared in its design towards the end of November of 1945.

The AMX M4 as of November of 1945. Note the changes in the hull and the appearance of the Maybach HL.295 engine.

By then, the AMX M4 began another metamorphosis. The turret was unchanged, but the hull and its interior changed drastically. The front plate was thinned out to 90 mm, the sides to 40 mm, but the slope of the UFP was increased from 42 to 55 degrees. The hull became more reminiscent of the Tiger II, but with the turret further forward. This introduced many problems with the hatches for the driver and hull gunner. It was decided to make them smaller and put them in the corners of the roof. The driver received an observation device similar to the one on the Panther Ausf. D and Ausf. A.

The AMX M4 kept changing in the winter of 1945-1946. One of the changes moved the crew around in the turret. Initially, the commander's cupola, essentially a copy from the pre-war AMX Tracteur C, was to the right of the tank. In December of 1945, it, like the Tiger II cupola, was moved to the left, increasing the resemblance of the two tanks.

A project for a bogey suspension, December 1945. This was the wrong way to go for simplification, note the complexity of the skirts and bogey mountings.

The changes to the hull, or rather the suspension, were more interesting. Designers realized that torsion bars are a very non-French solution, real French tanks use bogeys. They were presented as an alternative to the torsion bars. Not one, but two alternate designs were made.

The first variant was a re-imagining of the work of Surin, used on CKD tanks. While Surin used large wheels, the wheels here were much smaller than the ones in the torsion bar variant. Leaf springs were used, a bold move considering the mass of the tank. Since there were seven wheels per side, the front wheel received its own spring. Return rollers had to be added, four per side. The idler was also changed, and its tightening mechanism was very reminiscent of the good old Char B.

An AMR-35 type suspension design. This design was better than leaf springs, but still lost to the torsion bars. The project did not advance past designs on paper.

The other bogey design used the same idler. This variant had five return rollers, and the first and last were smaller than the rest. The number of road wheels grew to eight, so no individual suspensions were needed. Clearly there were some engineers that worked on tanks in the 1930s, as the suspension was taken straight from the Renault R35 and other light tanks of that era. Paired springs were used instead of rubber elastic elements; this design was a lot more progressive.

The final variant of the AMX M4, December 27th, 1945. This is what the tank would look like if it was ever built in metal.

Both bogey designs were rejected. Yes, torsion bars have their difficulties, and yes, Kniepkamp's suspension has its problems, but compared to what AMX engineers came up with, it was the height of perfection. Not only was the bogey suspension inappropriate for such a heavy tank, it turned out much more complicated. It is hard to imagine what kind of curses French tankers would utter if they encountered this design in production. The alternative idea failed.

Crew positions and ammunition storage in the AMX M4. The French should have stopped here, as this was a modern tank for its time.

By early 1946, the new Char M4 was finalized. It was an interesting fighting vehicle, similar to the Centurion Mk.3 in characteristics. This tank, officially designated as medium, weighed 50.8 tons, but managed to surpass the French design only in the thickness of turret and side armour. The Centurion had less effective hp/ton, and was more than half a meter longer. The guns of the two tanks were similar. The American M46 Patton also had similar characteristics. With an 810 hp engine at 44 tons, it came close to the French tank in mobility. Aside from the sides, the armour of the two tanks was similar. The American tank was taller than its competitors, and also longer than the French tank. The product of Ateliers de construction d'Issy-les-Moulineaux was a rather ordinary tank, very much in line with the international idea of a medium tank at the time.

The armour layout of the AMX M4. The weak side armour is not a mistake, but a result of studying the experience of WWII. Most hits came at the front of the tank. The hull armour is the same thickness and at the same angle as the IS-2. Perhaps the French knew something...

A year later, the M4 was once again radically redesigned, but more about that next time.

Read the next article in the series.
Original article by Yuri Pasholok.