Showing posts with label tractor. Show all posts
Showing posts with label tractor. Show all posts

Saturday, 15 March 2025

Tractors and Prime Movers

A maneuver war requires a large fleet of motorized vehicles, including artillery tractors. This lesson was learned back during the First World War. It is no wonder that the Red Army cared about mechanization so much. Soviet industry carried out their orders. A whole series of specialized tractors were designed in the 1930s. Many of them were built in great numbers and some were even the most numerous in their class.

Voroshilovets, the best Soviet artillery tractor. The Voroshilovets could tow heavy guns even faster than the rating of their chassis.

It so happened that production of artillery tractors ceased after the start of the Great Patriotic War. Some claim that the USSR should have built more tractors instead of tanks. This article will tell the story of why this was a bad idea and compare the results of Soviet mechanization with that of the Germans.

Monday, 14 November 2022

HPZ’s Unlucky First

August 20th, 1920, can be considered the starting point for Soviet tank building. It progressed pretty quickly. By 1921, the Red Army already had classifications for its new tanks. Captured British Mark V tanks were assigned to category B, or breakthrough tanks. Mk.A Whippet and Mk.B Hornet tanks were assigned to category S, manoeuvre tanks. Finally French Renault FT tanks and the Russian Renault were assigned to category M, support tanks. For obvious reasons, development of category B tanks was not expected until the future. They were too heavy and complicated for the nascent Soviet industry. A decision was made to focus on manoeuvre and support tanks. Work was conducted by the GUVP (Main Directorate of Military Industry) headed by Senior Engineer Shukalov as of August 1921. Until 1924, this department largely stood idle, since no decision was reached on who would build these tanks and how. There were various ideas discussed, including letting factories design their own tanks. There was already one such instance, although the development of the Teplokhod AN at the Izhora factory was never completed.

Final iteration of the 16 ton manoeuvre tank developed by the GUVP. This was a predecessor of the T-12 tank.

Monday, 25 July 2022

T-20 Komsomolets

The Red Army is often criticized for its vehicle fleet. On one hand, there is plenty to criticize. On the other hand, if one examines the situation carefully, it is often much better than claimed. This is especially true for tracked tractors. Even when you include civilian tractors, not everything was hopeless. Sure, the S-65 was not exceptionally quick, but in most armies of the world the only alternative would be a horse. If you count that as an alternative for the Red Army, the situation becomes different. Keep in mind that the S-65, STZ-3, and other slow moving tractors were only a temporary measure. The Red Army was not sitting idle and work on specialized vehicles was underway.

Komsomolets tractor during a demonstration at the War Motors festival.

Monday, 11 April 2022

T-34's Heart in a Tractor

The engine is the most complicated and most important component of any tracked fighting vehicle. It might even take more time to develop the engine than the rest of the tank put together. Even today, not all tank building nations have the ability to produce their own engines, and a successful design can define the development of tanks for years to come. The V-2 diesel engine put into production in 1939 was one such design. Last time we told the tale of the trials of this engine in the A-8 tank. This article will cast light on the second stage of the trials. This time, the new diesel engine was put to work on a heavy tractor.

Wednesday, 16 March 2022

SU-76 Misuse

 "#850469
June 19th, 1945

The GBTU Tank Usage Directorate received reports of incorrect use of SU-76 SPGs issued to rifle corps.

For instance, the 37th and 39th Rifle Corps of the 9th Guards Army used the SU-76 SPGs from the 1513th and 1524th Light SPG Regiments as tractors to tow captured vehicles over the course of 4-6 days, expending 25-30 engine hours and 250-450 km of travel for each SPG.

I order that:

  1. The use of tanks and SPGs to tow vehicles is forbidden. Tractors and prime movers are to be used for this purpose.
  2. Commanders of Armoured and Mechanized Forces of Fronts are to check the correctness of usage of all tank and SPG regiments attached to rifle corps.
  3. The commander of Armoured and Mechanized Forces of the 2nd Ukrainian Front must investigate the instance of incorrect usage of SU-76 SPGs of the 1513th and 1524th Light SPG Regiments attached to the 37th and 39th Rifle Corps and hold the guilty parties responsible.
Deliver this directive to commanders of armoured and mechanized units and formations of the Red Army and rifle corps commanders that have tank or SPG regiments attached.
Report on the execution of this order by July 10th of this year.

Deputy Chief of Armoured and Mechanized Forces, Colonel General of the Tank Forces, Korobkov".
CAMD RF F.38 Op.11362 D.16 L.23

Printed in Glavnoye Bronetankovoye Upravleniye Lyudi, Sobytiya, Fakty v dokumentakh, 1944-1945 p.549

Friday, 12 November 2021

Armoured Long Livers

 "Order of the Minister of the Armed Forces to the Commander of the Armoured and Mechanized Forces, Marshal of the Armoured Forces P.S. Rybalko on using unneeded armoured vehicles and spare parts for them

#452102
June 10th, 1947

Minister of the Armed Forces General of the Army comrade Bulganin permitted the use of unneeded armoured vehicles and spare parts for them in the following manner:

  • 131 MK-3 [Valentine] tanks, 63 SU-122 SPGs and 282 SU-85 SPGs in need of repairs are to be converted into prime movers for use in the Armoured and Mechanized Forces instead of tractors.
    Functional SU-85 SPGs can be used for training and converted into prime movers as they break down.

Saturday, 22 August 2020

An Ersatz Tank Destroyer from an Ersatz Tractor

Operation Barbarossa was a difficult trial for the Wehrmacht, as they ran into many unexpected complications. One of them was the presence of a significant amount of Soviet tanks with shell-proof armour (T-34 and KV). The 37 mm anti-tank gun was powerless against them. Another issue was the low quality of roads, which turned into a serious obstacle for wheeled vehicles and even halftracks as soon as the autumn rains came. The first issue was solved by introducing the 75 mm Pak 40, the second by creating the "eastern" RSO prime mover. In 1943 these were joined together to form an ersatz tank destroyer.

Thursday, 7 May 2020

Heroic Tractor Driver

"Award Order
  1. Name: Tikhonov, Ivan Gerasimovich
  2. Rank: Guards Red Armyman
  3. Position and unit: assistant tractor driver of the 88th Order of the Red Star Army Evacuation Company of the 6th Guards Tank Army
    is nominated for the Order of the Patriotic War 2nd Class.

Wednesday, 2 October 2019

Recovery

"Experience in recovery of sunken vehicles
  1. Divers examined the position of the tank. The tank was standing flat on its tracks. The bottom of the river was composed of clay.
  2. The descent to the river was steep with a 1.5 meter drop. A 15 meter long ramp with a grade of 30 degrees was dug to make recovery easier. The ramp was constructed 10 meters downstream from the existing pier. A part of the 1.5 meter tall shore was dug, a part of it was demolished with explosives.
  3. Three anchors were dug into the ground about 30 meters away from the water in a triangle shape. Two hoists of 6 pulleys with 12 2 cm thick cables were attached to the tow hooks of the sunken tank. The sunken T-34 was recovered with another T-34 and the help of the two hoists, each rated for 20 tons.

Wednesday, 6 March 2019

Bringing Tractors Back

"Order of the People's Commissar of Tank Production of the USSR #133-Ms
Moscow
January 21st, 1942

Factory #183 (director comrade Maksarev), having performed the evacuation of equipment to manufacture the Voroshilovets tractor, still has not organized production in its new location. Plant an factory leadership did not pay due attention to rapidly restoring the production of this vehicle alongside the production of the T-34 tank.

The Red Army's requirements for rapid transport for its troops and artillery are not being met. To make up for this drawback in the factory's operation, I order that:
  1. Director of factory #183, comrade Maksarev, must present me with a specific schedule of restoring and organizing Voroshilovets artillery tractor production within ten days. 10 tractors are due in April, 30 in May, and 50 in June.
  2. Director of factory #76, comrade Kochetkov, must supply sufficient amounts of V-2V diesel engines to produce these vehicles.
  3. Deputy Chief of the 1st Department, comrade Davtyan, must establish the list of parts and their amounts that are required by factory #183 from other factories.
  4. Chief Quartermaster comrade Rosin must supply factory #183 with a necessary amount of materials and purchased goods.
  5. My deputy, comrade Kotin, is to present me within 2 weeks a plan to produce a tractor based on the T-34 chassis at factory #183. 
  6. Deputy People's Commissar comrade Stepanov must report on the execution of this order by February 20th.
People's Commissar of Tank Production, V. Malyshev."

Monday, 28 January 2019

New Year, New Weapons

"Decree #443ss of the Committee of Defense of the Council of Commissars
December 19th, 1939
Moscow, Kremlin

On the acceptance of tanks, armoured cars, and artillery tractors into service in the Red Army and production in 1940

Based on the results of trials of new types of tanks, armoured cars, and tractors, produced in accordance with Committee of Defense decree #198ss issued on July 7th, 1938, and #118ss, issued on May 15th, 1939, the Committee of Defense of the Council of Commissars decrees that:
  1. The following are accepted into service in the Red Army:
    1. KV tank: heavily armoured, produced by the Kirov factory based on NKO tactical-technical requirements, with the correction of all defects discovered during trials. The tank must be armed with:
      1. An F-32 gun with a coaxial 7.62 mm machinegun in the gun mantlet.
      2. A separate 7.62 mm machinegun operated by the radio operator.
      3. One 7.62 mm machinegun in the turret bustle.
        Proved for full visibility from within the tank.
    2. T-32 tank: tracked, with a V-2 diesel engine, produced by factory #183, with the following changes:
      1. Increase the thickness of the main armour plates to 45 mm.
      2. Improve visibility from the tank.
      3. Install the following armament:
        1. F-32 76 mm gun with a coaxial 7.62 mm machinegun.
        2. A separate 7.62 mm machinegun for the radio operator.
        3. A separate 7.62 mm machinegun.
        4. An AA 7.62 mm machinegun.
          This tank will be named "T-34".
    3. BT tank: with a V-2 diesel engine, produced by factory #183.
    4. T-40 tank: amphibious, with a torsion bar suspension, high caliber machinegun, coaxial 7.62 mm machinegun, produced by factory #37.
    5. V-2 engine: 450 hp, produced by factory #75
    6. Voroshilovets tractor: artillery tractor with a V-2 diesel engine, produced by factory #183.
    7. ST-2 tractor: artillery tractor with a V-2 diesel engine, produced at the Chelyabinsk Tractor Factory.
    8. STZ-5 tractor: produced by the Stalingrad factory.
    9. BA-11 armoured car: on the ZIS-6-K chassis, 90 hp engine, produced by the Izhora factory.
    10. GAZ-61 light 4x4 truck produced by the Molotov Gorkiy Automotive Factory.
    11. ZIS-5 4x6 truck.
..."

Monday, 14 January 2019

Factory #183 Experiments

"July 2nd, 1940

To ABTU 8th Department Chief, Military Engineer 1st Class, comrade Afonin

Report on experimental work performed at factory #183 in June 1940

The following experimental work was performed in June of 1940.
  1. Trials of two A-7M vehicles ## 0314-2 and 903-03 with substitutes. A number of parts on these vehicles use iron instead of bronze or aluminium. A number of parts were also made from cheaper steels rather than highly hardened steel. Trials were completed, micro-measurements are being performed.
  2. Reliability trials of A-7M #327-45 have finished. The vehicle completed 3000 km trials. The report is being completed.
  3. Two engines from factory #75 are undergoing 150 hour trials. The engines were installed on A-7M ## 0890-3 and 442-55. The first engine worked for 70 hours and was removed due to significant leaking of gases between the cylinder block and head. The second worked for 125 hours, after which gases started penetrating into the water and throwing the cooling system water out through the reductor. A chronic defect of this diesel engine, breakdown of the automatic timing device, was also observed.
  4. Trials of a T-34 #0311-11-3 with track links cast from Hadfield steel, mechanical controls instead of pneumatic servos, and a reinforced cooling fan are being performed.
  5. The A-5 tank with the V-3 engine is being repaired. Work is going slowly due to plant #500 being loaded with production of the T-34 tank. The repairs are also slowed down due to the fact that blueprints and detailed descriptions are absent. The repairs are planned to be completed by July 10th.
  6. Voroshilovets tractor #68 warranty trials continue. 700 km remain.
  7. Tractor #7 with a V-3 diesel engine is being trialled. Trials will be complete in early July.
  8. Completion of the agreement between factory #183 and the Chemical Directorate is delayed. Assembly blueprints are complete, all that remains is for the Chemical Directorate to give final consultations and send the technical project to be approved. All other blueprints can be readied by early August.
  9. Development of a new project for a tractor on the T-34 chassis is complete. Assembly blueprints are being copied and detailed blueprints are being made. The development of detailed blueprints can be finished by August 10-15th. Delays in producing the blueprints can be explained by a shortage of copiers.
  10. Production of pneumatic components for the Voroshilovets tractor is in progress. Two prototypes may be assembled in July.
Senior Military Representation, Military Engineer 2nd Class, Kozyrev
Military Representation, Military Engineer 3nd Class, Baikov"

Tuesday, 25 December 2018

Factory #183 Experiments

"May 31st, 1940
#246s
To the Chief of the 8th Department of the ABTU, Military Engineer 1st Class Afonin

Summary report on experimental work at factory #183 in May of 1940

In May, the following work was performed at the factory:

  1. Trials of track links cast from Hadfield steel for the A-34 vehicle. Results of preliminary trials that consisted of driving for 420 km, including 140 km on a cobblestone highway, were satisfactory.
    The vehicle reached an average speed of 37 kph on a cobblestone highway, and several braking maneuvers were performed when driving at top speed (50 kph). After inspection, cracks were discovered in about 80% of the tracks with teeth. Trials of the track continue until it is worn out completely.
  2. Trials of mechanical servo controls are being performed on that vehicle. The results are good. I consider it necessary to introduce mechanical servo controls into production.
  3. In May 150 hour warranty trials  of an A-7M with a V-2 engine were performed. The vehicle travelled for 2050 km. The engine worked for 65 hours, after which trials were stopped due to a defect of the engine (penetration of gases). In parallel, replacement components, including a cast iron gearbox case, were tested. The vehicle drove for 800 km, after which the case cracked. At this time another gearbox with a reinforced iron case is being prepared for trials on another A-7M.
  4. A vehicle with substitutes for components that use non ferrous metals is being prepared for trials, which will begin in the early days of June.
  5. Inspection of parts of an A-5 vehicle which is due to receive a six cylinder V-3 engine. The refurbishing of this vehicle is delayed because factories #75 and #183 cannot agree on the required degree of modernization.
  6. An A-7M with a factory #75 engine with a 150 hour warranty is being assembled.
  7. The Voroshilovets tractor with a V-3 (six cylinder) diesel is assembled and has gone through a breaking in drive. As a result of the drive, a number of defects were discovered in transmission components. The tractor is being repaired and will be ready for factory trials on June 2nd-3rd.
  8. Partial warranty trials of Voroshilovets tractor #68 were performed in May. The trials were delayed due to a refusal by factory #183 to carry out the trials at its expense. Presently, the trials have resumed. In addition, a number of experimental components with replacement metals are being tested in the Voroshilovets tractor.
  9. Design bureau "520" is working on blueprints for a flamethrower installed in the A-34 tank. All detailed blueprints must be ready and submitted into production by June 1st, 1940.
  10. Work on a technical tractor on the A-34 chassis is underway.
  11. In May factory #183 received the objectives for 1940, but a specific plan for achieving those objectives was not established. A number of objectives might not be met, such as the trials of the V-2 engine in special conditions, as the factory does not have clarity on this issue and no specific measures are being planned. It is necessary to clarify a number of issues in the immediate future in order for the factory to complete its objectives in the required timeframe.
Senior ABTU Military Representative, Military Engineer 2nd Class Kozyrev
ABTU Military Representative, Military Engineer 3rd Class Baikov"

Wednesday, 28 November 2018

Factory #183 Experiments

"August 1st, 1940
#382s

To Chief of the 8th Department of the ABTU
Military Engineer 1st Class, Afonin

Report on experimental work for the month of July at factory #183
  1. Design bureau
    1. Two variants of a T-34 with a flamethrower have been developed. Presently, working blueprints are being composed. The deadlines outlined in the agreement are not being met.
    2. A technical project of a tractor on the T-34 chassis has been completed. Working blueprints of several components have been sent to production. The established deadlines are not being met. Production of blueprints is running 15-20 days late.
  2. Experimental plant #540
    1. Trials of the V-3 engine on an A-5 tank were performed. Trials began on July 17th, but the first outing showed that 250 hp is not enough for an A-5 tank. The engine only reached 1400 RPM in 4th gear on level terrain. After that, the engine was removed and adjusted to 300 hp. Trials resumed on July 24th. The mobility of the vehicle improved with an increase in power. The engine reaches 1800-1900 RPM on level terrain.
      As of July 31st, the engine had worked for 30 hours, after which it broke due to gas penetration.
    2. Assembly of two T-34 tanks with M-250 engines was performed. One tank was completed, and trials will begin on August 1st. The second vehicle is due for completion on August 10th.
    3. Voroshilovets tractor trials with components made with substitutes were performed. The tractor went through 1000 km of high speed trials. Towing trials remain, which will be performed in August.
    4. Two Voroshilovets tractors were assembled for installation of pneumatic controls. Installation of pneumatic controls will begin on August 1st and complete in the first half of August.
Acting regional engineer, Captain Rusakov"

Wednesday, 13 June 2018

Prewar Prototypes

"November 11th, 1939
#0830/s

To the Chief of the 8th Department of the ABTU, Military Engineer 1st Class comrade Afonin

Report on the trials of the A-32 (weight down) and preparations for trials of the A-20 and Voroshilovets tractor
  1. The A-32 (second prototype) weighed down to the weight of an A-34 has travelled 1047 km. During the third march, the average moving speed off-road was no more than 20-23 kph. This was caused by terrible conditions of the terrain (mud). Typically, the vehicle can only drive in second gear off-road. The transmission is working well in these conditions, there haven't been any defects. A trip on a highway is planned on November 10th to test the running gear.
  2. Presently, A-20 components (improving the wheeled drive transmission) are undergoing mechanical finishing.
  3. Despite our insistence, Voroshilovets tractors are not being worked on at all. Management of department 500 claims that its equipment is occupied with other projects (A-7, D-3, D-5, etc). This situation may result in the Voroshilovets tractor not being ready for mass production by January 1st, 1940.
Military representative of the RKKA, Military Engineer 3rd Class, Baikov."

Wednesday, 16 May 2018

Hide Your Guns

The need to hide artillery appeared long ago, but the military took development of camouflage paint schemes seriously only on the cusp of the 19th and 20th centuries. Progress in observation methods and increased movement of all sorts of forces played an important role. Widespread use of firearms and the introduction of aircraft dispelled the romantic notion of tight formations and colourful uniforms. There was a sudden need to quickly hide equipment, especially large equipment such as tanks, guns, and automobiles, but not at a cost to mobility. How did the Red Army deal with camouflage during the Great Patriotic War?

Tuesday, 6 February 2018

Improved ZIS-30

"Tactical-technical requirements for the design of anti-tank artillery

1. The main purpose of anti-tank artillery is the escort of armoured units, combat against enemy tanks, enemy anti-tank artillery, and suppression of machinegun strongholds (nests) during an offensive with infantry or tank riders.

2. The anti-tank SPG must satisfy the following requirements:

Tuesday, 17 October 2017

Improved Tractor

"To the Chief of the 3rd Departmetn of the GAU UMT
Engineer-Major comrade Bozilenko

On the issue of trials of the ATZ-3T tractor

I inform you in this letter that the ATZ-3T tractor, designed and assembled at the ATZ on the 1TA tractor base was subjected to factory trials and drove for 400 km along various roads and mountain terrain. The tractor was assembled by means of mounting new components on an altered chassis of a prior experimental tractor. The gearbox and other transmission mechanisms, suspension, and other components were taken from an existing tractor without changed, and had already worked for 700 hours. The altered components of the tractor worked well, without breakdowns or defects, and are in good condition even now.

Monday, 4 September 2017

Tank Trailers

"Minutes of a meeting at the 5th Department of the GABTU BTU with representatives of tank units on the issue of trailers for tanks proposed by factories #592 and #112

The meeting was led by the Chief of the 5th Department of the BTU, Military Engineer 1st Class, comrade Afonin.

Afonin: We gathered representatives of tank units by order from Army Commissar 2nd Class Biryukov to discuss the proposal of engineers from factories #592 and #112 to build trailers for tank riders. [Reads proposal from factory #112 and explains technical issues connected with factory #592's proposal].

Friday, 1 September 2017

Trophies from Galicia

Starting with the late 1930s, testers in Kubinka began receive foreign vehicles from all corners of the world to try on for size. The first to come were trophies captured in Spain during the civil war, but the floodgates opened in 1939. The first to come was the Japanese Ha-Go tank, and Polish vehicles came after that. One of them was the TK-S tankette.