Sunday, 10 November 2013

World of Tanks History Section: M3 Lee

This tank is accurately described by the saying "third time's the charm". When the American National Armament Program started in 1940, the US had no medium tank that could be mass produced. The program declared that the United States must produce 14.5 tanks per day by the end of 1940, even though it was not clear which tank. The existing M2 Medium tank was a weak candidate due to its 37 mm gun. 92 M2A1 tanks were built from January to August of 1940, exclusively as a temporary measure until a new medium tank began mass production.

So, the 37 mm gun was insufficient for the Army. Infantry commanders demanded that the new tank have a gun at least 75 mm in caliber. The problem needed to be solved quickly, but the American engineers had no turret that could fit this kind of gun. In order to save time, the engineers decided to make a poor move and build a wooden mockup of the tank with a 75 mm gun in a sponson on the right side of the tank. This stroke of "genius" greatly complicated the lives of American tankers, since it made aiming in a 360 degree range impossible. The tank would have to spin like a top.

In the engineers' defense, they also did not agree that this was a good move, and admitted that it would only be a temporary design, until a tank with a turret that could fit a 75 mm gun was designed. The Army decided that about 350 tanks would be built, then production of new tanks with a fully rotating turret would start.

The issue of tank manufacturing was a painful one for America. It did not have the appropriate manufacturing facilities. There was only a small government factory at Rock Island Arsenal, incapable of satisfying the increasing demand. Private manufacturers needed to be involved. The choice was between approaching heavy machinery manufacturers, or automobile ones. The decision was made towards the latter, as heavy machinery largely deals with one-off designs, and car manufacturers were used to true mass production. The government offered Chrysler to share the costs of building a tank manufacturing plant in Michigan. The government would be the owner of the factory, but Chrysler would be in control of it. Close collaboration with Rock Island Arsenal would provide compatibility between the various technologies and devices in the future tank.

Aberdeen's engineers started developing the M3. The new tank had a similar engine as the M2, and the same suspension. Homogeneous rolled armour was attached with rivets, like on the M2. The turret and sponson were cast. In order to reduce spalling, the inside of the tank was covered in porous rubber.

The tank crew was initially 7 people. They had to get into the tank through side doors, sponson hatch, and the commander's cupola. It gave the 31 ton tank very good visibility.

By February of 1941, the new tank project was ready, and the Michigan factory was almost complete. All that remained was to build the new tank and test it. A sample was sent to Aberdeen on March 13th, 1941. Test results were unsatisfactory: poor crew compartment ventilation, vulnerable side doors, high chance of the gun getting stuck in the sponson after taking a hit, weakness of the suspension. However, the turret controls and gun stabilizer were excellent; the loader could aim very comfortably even when zigzagging across harsh terrain.

The next M3 had all of its doors replaced with an evacuation hatch on the bottom, the crew was reduced by one, the periscopic sight was replaced with a telescopic one, among many changes. In August of 1941, the M3 began mass production. From August of 1941 to December of 1942, over 3500 M3 tanks of this type were built.

The British also used M3s. They named their tanks "Grant", and the American ones "Lee", after American Civil War generals.

As we said before, the M3 was built only because nothing better existed. A large portion of the tanks were sent to Britain and the USSR. The latter received 976 vehicles, spread across independent tank battalions, brigades, and regiments. The American tank fought on all fronts, was used at Kursk, and one even made it to the Far East. The Red Army was not a big fan: the tank had poor cross-country performance, was very tall, and had rubber tracks that burned up easily. The tank became immobilized, and presented a nice target for enemy guns. The tracks also frequently fell off. Many complaints were made about the 75 mm gun, which was very difficult to aim. These drawbacks led to the M3's nickname in the Red Army: BM-6 (Bratskaya Mogila - 6, Grave for Six Brothers).

In the armies of the Allies, the M3 was completely replaced with the Sherman by 1944, and the Soviets got rid of theirs as fast as they could. However, after the war, they still saw use in South-East Asia. Many vehicles were developed on the M3 chassis, from SPGs to engineering vehicles.

Original article available here.

Saturday, 9 November 2013

Comrade Vovk and the Chamber of Secrets

Decades after the fact, documents on tank development are scattered throughout archives. You can't go into CAMD and open the IS-4 box to get everything and everything on the project. You'd think that it would be a lot easier to get information on the projects at the time of their creation, provided you had proper clearance. You'd be wrong.

"To the chief of the Red Army GBTU TU, Major-General of the Tank Forces, comrade Afonin

I send to you the report of the senior military representative at factory #100, Guards Engineer-Lieutenant-Colonel colonel Vovk. I think that the facts of the matter violate the proper behaviour towards military representatives, especially senior military representatives, and require immediate action.

Without a concrete plan of experimental works, factory #100 performs discretionary research, which brings little benefit to producing new tanks or improving already existing ones.

Through a private means, I discovered that factory #100, led by comrade Kotin, is developing a new vehicle that is a counter to Object 701. When requested details on this project, comrades Kotin and Soloduhin officially stated that no such work is being performed at the factory.

When comrade Vovk was appointed as the senior military representative at factory #100, he happened upon a "mysterious room", to which he was not admitted, which is described in the attached report. At the same time, most work on subjects such as approval of IS blueprints and technical documentation have not been completed: steel plate radiator, planetary transmission, improvements of the gearbox, AA mount, driver's seat, final drive gears, V-2IS engine defects, etc.

I ask you to act on the leadership of factory #100 and restore firm control of the factory by military inspectors, especially regarding hiding experimental work. The leadership must be reminded of the role of the military inspectors in accordance to a Government Decree well known to you.

GBTU KA representative, Engineer-Lieutenant-Colonel  Markin
April 22nd, 1944
Attachment: report on 1 page

To the GBTU KA representative, Engineer-Lieutenant-Colonel comrade Markin

After my appointment to the role of senior military representative at factory #100, I encountered the following situation:

When familiarizing myself with the work of the design bureau, I discovered a room, which was guarded by factory staff. They denied me entry, stating that only a note from General Kotin can grant access. When I met comrade Kotin, I told him of the event, to which he answered "This is my personal office". In reality, this room is occupied by Schneidman, Shashmurin, Turchaninov and Mitskevich, who replied to my inquiry of what goes on in that room with "it is a smoking room".

It is evident that the factory is conducting work which are being hidden from me. On April 12th, 1944, an AA mount for Goryunov's machine gun arrived. It should take 3-4 days to figure out how to mount it on the tank. No work has been done by this point, and my demands are being ignored. Factory director comrade Kotin gave it to the chief engineer, comrade Belyakov, and told him "if it doesn't take too long and will not compromise the quota set by the People's Commissar, then do it".

I checked, and the factory does not have a quota for either the second quarter or the month of April set by the People's Commissariat of Tank Manufacturing; the factory is working to quotas it set itself.

As a result, the Goryunov AA mount is not ready. I consider the above abnormal, and ask for directions on what to do.

Senior Military Representative of the Red Army GBTU at factory #100, Guards Engineer-Lieutenant-Colonel Vovk.
April 18th, 1944."
CAMD RF 38-11355-2214

The situation didn't improve one year later.

"To the Director of factory #100, Lieutenant-General of the Engineering-Tank Forces, comrade Kotin

The GBTU KA representative at the Kirov factory, Engineer-Lieutenant-Colonel comrade Markin and senior military representative at factory #100 comrade Vovk reported that the working conditions at factory #100 are such that he cannot fulfil his duties.

The impeding work conditions consist of employees hiding a portion of experimental work performed at the factory. This treatment of military inspections violate the Decree of the Committee of Defence of the USSR SNK from July 15th, 1939 #204, "On military representatives of the People's Commissariat of Defence in industry".

I ask you to take necessary measures to create proper working conditions for military inspections in accordance with the above Government Decree.

Deputy chief of the Red Army GBTU Lieutenant-General of the Engineering-Tank Forces Lebedev
Chief of the Red Army GBTU TU, Engineer-Lieutenant-Colonel Blagonravov

April 10th, 1945"
CAMD RF 38-11355-2805

Judging by the dates, the former secret project would have been the IS-6, and the latter one Object 260 (IS-7).

Friday, 8 November 2013

T-50 from Start to Finish

I have written previously about T-50 tanks, but those documents tell only one side of the story. Here are some more.

The T-50's main idea started in the 1940 "Kirovets" project (not to be confused with Kirovets-1, the IS-3). 


The Kirovets weighed only 9 tons, but had impressive 37 mm of armour. The T-26's engine would allow it to reach 50 kph. The project was designed for airborne drops, but it was too heavy for such tasks, which was one of the reasons why it was closed down. Still, the T-50 borrowed many concepts from this project.

One of the original T-50 plans for 1941: 

CAMD RF 38-11355-112

"Tank "SP" T-50. Produce two experimental prototypes with planetary transmissions. Install an F-2 57 mm gun with two coaxial DT machine guns and a commander's observation cupola. The horizontal fire angle is 360 degrees, 30 degrees of elevation, 7 degrees of depression. Ammunition capacity: 100 shells. Perform proving ground and army trials."

As we know, the tank never got a 57 mm gun, but a 45 mm one, and only one machine gun.

Skip forward to September of 1941. The T-50 was trialled, a small number were produced and fought. Factory #174 was dealing with an evacuation. In the meantime, what was the evaluation of the project?

CAMD RF 38-11355-62

"To the secretary of the Central Committee of the VKP(b), comrade Malenkov
Deputy of the Chairman of the Council of Commissars of the USSR, comrade Malyshev

According to order #1749-756ss of the USSR SNK and CK of the VKP(b) from June 25th, 1941, factory #174 must produce 620 T-50 tanks in 1941. Factory #174 produced only 37 tanks. The plan for production of T-50 tanks has failed. Additionally, work on removing flaws has not been completed.
Due to the evacuation of factory #174, production of T-50 tanks is completely stopped.
The initial short combat application showed that T-50 tanks' parameters satisfy the requirements, and must be mass produced for the Red Army. In order to immediately begin mass production of T-50 tanks, I ask of you the following:
  1. Give the order to produce at least 500 T-50 tanks according to the current blueprints and technical conditions of 1941, assigning the necessary equipment and factories.
  2. Assign a factory to produce the V-4 diesel engine, with enough production capacity to satisfy the need for T-50 tank engines.
  3. Propose that the factory #174 design bureau urgently perfects the following components to provide reliable tank performance:
    1. Gearbox
    2. Track links
    3. Engine starter and cooling
  4. Propose that the factory #174 design bureau presents, by October 15th of this year, an improved T-50 tank project with the following elements:
    1. Increased thickness of front, rear, and turret armour to 55 mm, with simultaneous increase in the hull armour plate connection strength.
    2. Protection for the turret ring.
  5. Begin producing these improved T-50 tanks starting on January 1st, 1942, producing no fewer than 5000 of them in 1942.
I ask that you reply with your decision.

Deputy Commissar of Defense of the USSR, Lieutenant General of the Tank Forces, Fedorenko
Red Army GABTU Military Commissar, Military Commissar 2nd Grade Biryukov"

5000 T-50 tanks! When only dozens were actually produced? Fedorenko had guts. Even optimistic production plans only gave him 1500 T-50s in 1942.

However, the T-50 was already doomed in the middle of 1941. The T-60, also not immune from problems of its own, but a much more realistic project, has already started sapping at the T-50's production base.

RGASPI 644-2-5

"To Comrade Molotov V. M.

The USSR SNK and CK of the VKP(b), on June 25th, ordered the production of T-50 tanks at factory #37 (in parallel with factory #174). The release of T-50 tanks was scheduled to start in October. 
I think that, at this time, it is nonsensical to set up production of new tanks in Moscow and lose the ability to produce light tanks in the meantime.
Therefore, I ask that:
  1. The Commissar of Medium Manufacturing allows for continuation of light tank production at factory #37.
  2. Factory #37 begins producing not an amphibious tankette, but a land light tank. Turning the amphibious tank into a land tank will result in simpler mechanisms and hull, allowing to increase the armour somewhat, and increase the amount of tanks built.
GABTU (comrade Fedorenko) is in agreement. I ask for approval of this project by the GKO.

July 14th"

The "amphibious tankette" in question is the T-40. The "land light tank" was its simplification with improved armament, the T-60. Nearly 6000 T-60s were produced in total, compared to 75 T-50 tanks.

The T-50 refused to go quietly. A list of prototype projects at the Kirov factory as of December 22nd, 1941 (CAMD RF 38-11355-720) contains a T-50 with a 37 mm AA autocannon, scheduled to be completed by March 1st, 1942 and a T-50 minesweeper, to be completed by June 1st, 1942, as well as a project to replace expensive metals in the V-4 engine with cheaper ones, to be completed by May 1st, 1942. 

Wednesday, 6 November 2013

Penetration, Part 4

This article covers a number of guns from 1945. Some of them you have seen before, some of them are new.
CAMD RF 38-11369-696

The header row lists the guns the document covers: 85 mm D5-85-BM (factory #9), 85 mm D10-85, 85 mm S-34-IV (TsAKB), 122 mm S-34-II (TsAKB), 122 mm D-30 (factory #9), 122 mm BL-9 (OKB-172), 122 mm S-26-I (TsAKB), 130 mm S-26 (TsAKB), 152 mm BL-10 (OKB-172), and the 122 mm BL-13-1 (OKB-172). 

The second row shows the vehicle class the gun would have been mounted on. The first three 85 mm guns are for medium SPGs (presumably, it just says SU). The next two 122 mm guns are for the Object 701 (IS-4) and IS-6 respectively. The next 4 guns of various calibers are for heavy SPGs (same, but ISU). The last gun is marked for the IS-6, but crossed out. 

The next row is for the muzzle velocity of the shell, AP (top) and HE (bottom). The row after is for maximum ranges. The range of most guns in the ISU is limited by the gun's elevation, rather than the propellant.

After that is what we came here for, the penetration values. The numbers for the D-30 are similar to that of the D-25 we have seen in previous tables. The penetration of the BL-10 is a little lower than the value in the first article of this series; it has been reduced by 4 mm at 100 meters, and also drops off faster. 

The D5-85-BM, on the other hand, received a marginal improvement. The D10-85 blows it out of water with penetration surpassing that of the slower 122 mm guns. The S-34-IV performs similarly. 

The line after that is the rate of fire. After that, ammunition capacity. After that, crew members in the gun's vehicle. 

Soviet Air Filters

Many complaints are lodged against Soviet air filters (mostly based on the Americans mistreating a Pomon).

While the Pomon wasn't a perfect filter (it only cleaned the air to 80% purity at 1 gram per cubic centimeter), the Soviets already had a better filter in 1940: the "Vortex", planned for installation on the T-50. The Vortex, developed at factory # 174, could filter the air to 98% purity without being cleaned for 10 hours. However, the T-50 fate was rather unfortunate, and it was not made in large numbers. The filter was then successfully used on KV tanks, until it was replaced by the Cyclone filter. It was also used on early KV-1S tanks, SU-152 SPGs, and the KV-13.

Figure 44: "Vortex" type air filter, used on KV tanks. CAMD RF 38-11355-2543

The air is cleared by entering the filter at an angle, and forming a vortex, dropping the dust into the oil pan underneath. The Cyclone filter, Vortex's replacement, reverses the flow of air, dropping the dust out of it more effectively, like so:



I have previously mentioned the Multicyclone filter. Let's take a closer look.

CAMD RF 38-11355-1630
Multicyclone filters installed in the KV-1S (top) and IS tanks (bottom)

Even the Cyclone filter, which provided 99.4% air purity at air dustiness of 1 gram per cubic meter, was unsatisfactory to the Soviets. In May of 1943, a new filter was tested on the KV-13 (Object 233), which provided 100% air purity at dustiness of 3 grams per cubic meter, and could operate without cleaning for twice as long as Cyclone. 

The air filter was installed in all Soviet medium and heavy tanks from 1943 onward.

Monday, 4 November 2013

Driver's License

War can be chaotic, but there are still some rules that have to be followed. For example, you still need a license to drive a vehicle. LiveJournal user babs71 was kind enough to share one that his grandmother had.


"GABTU KA 04438 license to drive combat vehicles"


"GABTU KA 04438 license to drive combat vehicles. Courses finished well"

"Well" corresponds to the commonly used Russian grading system. It is the 4th level out of 5, under "Excellent". Levels 1, 2, and 3 do not have names. The 3rd level would be equivalent to a "satisfactory", while 2 would be a failure. 1 is reserved for special cases of exceptional failure. 


The upper left corner has a place for your photograph. The text next to it says "The license is stored at the unit office, and is handed out along with a travel document. While operating the vehicle, keep it with you at all times." The next page states the operator's unit and "LICENSE: Issued to Hofs R. M., certifying that he has the right to drive an STZ 3-5 tractor." Even though the Red Army had servicewomen, I guess the paperwork wasn't updated to include female pronouns.  


"
  1. Completed the tractor operator courses
  2. Passed the exam for driving tractors STZ 3 and 5
  3. Order from the unit on June 30th '4 [the last digit is illegible]
  4. #222
  5. Unit commander [signature]"
Two more spaces remain for additional qualifications.



"Information about the driver:
  • Profession before military service
  • Party affiliation
  • Year of birth"

Sunday, 3 November 2013

Improving the IS-2

The IS-2 model 1943 (at this point, still indexed IS-122) was a fearsome opponent for enemy tanks, infantry, and fortifications alike. However, there was still room for improvement. The following document outlines some proposed changes to the tank.

"Measures to increase the combat ability of the IS-122 tank

1. Turret and hull

1. A hull whose strength matches the armament may only be reached by replacing the clearly obsolete shape of the upper front plate. The front of the IS-122 must be shaped like the front of the T-34, with a 120 mm rolled armour plate (figure #11) within the limits of the tank's dimensions (figure #12).

Figure #11. Parallel cross-section of the front of the IS-122 tank hull. 

Figure #12. Front of the altered IS tank hull. 

The necessity of producing this type of front hull is confirmed by penetration tests of the front plates of the Panther tank with the German 88 mm gun from the Ferdinand SPG. The upper front plate of the Panther tank, 85 mm thick and sloped at 55 degrees, could be penetrated with armour piercing shells at 600 meters. The altered front of the IS-122 tank hull will be impenetrable by armour piecing shells from the 88 mm gun (Ferdinand SPG) at any distance.

The front of the turret should be 200 mm thick, turret sides 150 mm thick. 

2. Increase in fuel storage, ammunition capacity, and crew comfort may be reached by increasing the width of the hull within the dimensions of the tank (figure #13). 

Figure #13. Perpendicular cross-section of the IS-122 tank hull.

Due to obvious advantages of rolled armour over cast, the upper hull should be produced with rolled armour. By placing the sides at 45 degrees (instead of the current 15), the thickness of the plates could be reduced to 75 mm.

2. Armament

1. Due to the outlines disadvantages of the 122 mm gun (two-piece ammunition, screw breech), it is necessary to replace it with a smaller caliber gun of equivalent power (preferably 100 mm). "

- CAMD RF 38-11355-2369

A lot of these features were implemented in the model 1944 modernization, but not all. For example, the 100 mm gun projects never really got anywhere. Instead, the gun was equipped with a superior semi-automatic sliding breech, but kept the two-part ammunition.  

One-part ammunition was definitely attempted.

CAMD RF 81-12038-697

"To the Chief of the GAU KA, Marshall of Artillery, comrade Yakovlev

Regarding the letter from GAU KA from May 12th, 1945 on the topic of order 940670ss, I report that as a result of GOKO decision #6863ss on November 4th, 1944, NKV factory #9 developed an experimental 122 mm D-25 gun that uses one-piece munitions, and sent it to the Kirov factory on May 21st, 1945, in order to be mounted in the IS tank

D. Ustinov"

I don't envy whoever had to serve as the loader on that experimental tank. 122 mm ammunition is rather large.

T-44, first variant, with 122 mm gun, demonstrating the dimensions of the shell.


Here are models of the existing IS-122 (center) and proposed hulls, surrounding it. Neither was used, but the right one inspired the IS-6 hull shape.

As for the ammunition storage on the IS, here is an attempt to increase it.

CAMD RF 38-11355-2606

The diagram is a bit convoluted, but it makes a lot more sense with the labels:

"Diagram #2. Placement of 122 mm ammunition in the IS-122 tank.
  1. Thirteen armour piercing tracer shells in the turret bay.
  2. Fifteen high explosive fragmentation grenades in the turret bay.
  3. Three additional shells affixed with belts to the lids on the ammunition crates.
  4. Twenty six propellant casings in the fighting compartment, and two on the side of the turret.
  5. An additional placement of three casings with propellant placed as follows: one on the lid of the left ammunition crate, one in the front left corner of the hull, one in the right hull bay."

45 mm APCR, Part 2

In 1942, Soviet engineers began experimenting with subcaliber ammunition for the 45 mm anti-tank gun. Such ammunition required tungsten, and tungsten is rare and expensive. To refresh your memory, the engineers attempted to use highly hardened steel to compensate, without much luck. Here, they came up with another solution.

"REPORT on the testing of 45 mm subcaliber armour piercing shells with experimental bimetallic cores, blueprint #3-07955

The trials are done above quota, according to paragraph 1 of the work plan of the Special Group of the AK GAU KA for 1942, presented for approval to the Chief of the AK GAU KA as #001132 on May 19th, 1942.

Over the period between May 28th and June 6th, 1942, the Special Group of the AK GAU KA performed experiments on potential partial replacement of tungsten with steel in cores made from the Reniks-6 metallo-ceramic alloy (with a tungsten carbide core) in subcaliber armour piercing shells on blueprint #3-07955.

In the first trial, the idea of a core with two heterogeneous metals was tested: the tip made of the Reniks-6 tungsten alloy, used in mass produced 45 mm APCR, and the rest of the cylindrical part from steel. The joint was done by welding with a copper base. The first trials attempted to remove 50-60% of the tungsten from the core.

1. Production of experimental bimetallic cores

Figure 1 shows the bimetallic core, which was selected for trials.

Fig 1. 

As can be seen from the figure, the front 35 mm of the core is composed of the stock Reniks-6 tungsten alloy, the rest from HV5 grade steel. The HV5 grade was selected out of practical considerations, as it was the only one present.

The mass of the components is approximately as follows:
  • Tungsten tip: ~100 grams
  • Cylindrical metal part: ~90 grams
which reduces the tungsten alloy use to 40% compared to a standard 0.270 kg core. 60% of the tungsten is saved.

Due to the prediction that the production of these shells at a factory would take along time, it was decided to produce 3-4 samples in an improvised fashion, to test out the idea. Four stock tungsten cores were chosen, 70 mm and 250 grams on average. It was decided that incisions would be made in the middle of each one, i.e. 35 mm from the ends. An attempt to make the incisions with cutters made from tungsten carbide failed, the cutters dulled and cracked, while no traces of a cut were seen on the core. A diamond tip from a Rockwell tester from the 2nd department of the Gorohovets ANIOP was used, which was never used for its intended purpose (it was missing a fragment of the diamond). The diamond let us make a groove 1.5 mm deep, but was too short to continue. The cores were then broken into two pieces by striking them with a mallet. The separation was mostly along the line cut by the diamond, but was uneven. Two of the cores had missing fragments from the section we were going to test. Using a sanding wheel, we were able to get rid of the unevenness and sharp edges of the fracture.

After that, using 45 mm HV5 steel cores meant for 76 mm subcaliber shells, cylinders 30 mm in diameter and 35 mm in length were produced. The two parts of the core were welded together at the laboratory of the 2nd department of the Gorohovets ANIOP in the following fashion: the steel part of the core was heated up in the electrical oven to a temperature of 880 degrees, then dusted with borax. As soon as the borax started to melt, the surface of the cylinder was cleared of debris using a metal brush, then was again dusted with borax, and covered with the tungsten part of the core. Small pieced of red copper were placed on the excess surface of the cylinder, and it was placed in the oven, heated up to 1100 degrees, and removed after the copper melted. In order to achieve better contact between the components of the core, the tungsten part was pressed to the steel part by hand, and then the cooled product was finished on a lathe in a manner similar to the stock tungsten core.

The average Rockwell hardness of the steel part of the core before mechanical finishing was R_C150 ~=32, which is equivalent to Brinnel H_B ~= 300, or a print size of about 3.5 mm.

The welding quality of all 4 cores was unsatisfactory, due to the fact that the parts of the cores in contact with each other had significant spaces, which were not filled with copper. Out of the worst two, one (#2) was shot, and the second (#4) was left as a sample. Photo #1 and #2 show the core in 2.25x magnification in two views, on which 'a' labels a 5 mm long space, that is 6 mm deep and 1 mm wide. 'б' marks a missing fragment, leading to a space 17 mm long, 5 mm deep, and 6 mm wide at its longest point. 

Photos #1 and #2


Masses of the produced cores:
  1. 190.6 g
  2. 182.7 g
  3. 186.2 g
  4. 180.7 g
The stock weight of the core is 270 grams. However, the average weight of the cores fired at the Gorohovets ANIOP, as well as the average weight of the cored examined, was 250 g. The loss in mass is 60-69 grams from average weight and 80-89 grams from blueprint weight.

Shell: 45 mm blueprint #3-07955, with prototype core, shell weight is 0.770 kg
Gun: 45 mm ATG, model 1932/37, #7646
Armour: 60 mm homogeneous, K=2350, #18078-8-9-43
Angle: 30 degrees
Gunpowder and charge weight: 6/7 sv 3/38 R w=350
Impact velocity: 946.8 m/s
Result: Clean penetration, one core caliber in diameter. The steel component and the tungsten component with a crack through it were found behind the armour. The dent from the casing is 7 mm.

Shell: same, 0.761 kg
Charge weight: w=0.330
Impact velocity: 904.1 m/s
Result: Clean penetration, one core caliber in diameter. The steel part of the core was found behind the plate, slightly compressed axially.

Shell: same, 0.764 kg
Charge weight: w=0.320
Impact velocity: 875.6
Result: dent. Both parts of the core were stuck in the plate. The steel part of the core was not destroyed. The rear of the plate had a bump, 5-8 mm tall. The dent from the casing is 7 mm.

Conclusions:

Despite the crude production method and unsatisfactory quality of the weld, the bimetallic components penetrate a 60 mm plate with a coefficient K=2350 with a velocity of 904 m/s at 30 degrees. The distance that this velocity is achieved at, when shooting with a full charge (Vo = 1035-1040 m/s) is 250 m.

Therefore, the 45 mm subcaliber armour piercing shell made using blueprint #3-7955 with a bimetallic core, composed of 100 grams of tungsten and 81-91 grams of steel, mostly solves the objectives set by Artkom GAU KA (#570896, from January 25th 1942) "penetration of 60 mm of armour with resistance 2200-2400 from a distance of 250-500 meters, at an angle of 30 degrees". The distance of penetration is short by only 50 meters.

The savings of tungsten carbide alloy are approximately 60%.

The steel part of the core made from HV5 grade steel penetrates the plate in the event of a through penetration, either wholly or in fragments."

And so, using some broken lab equipment, a mallet, and some steel they had lying around, the scientists managed to put together workable subcaliber shells. Recall that all steel subcaliber shells could not penetrate a 50 mm plate at ~100 meters reliably, and could not penetrate a 60 mm plate at all. Full tungsten carbide shells could penetrate 80 mm of armour at 250-300 meters (depending on the shell type). The penetration suffers, but the resulting shell uses less than half of the tungsten necessary to produce a full one.

Saturday, 2 November 2013

Barabash's Automatic Loading Mechanisms

In December of 1942, Engineer-Captain G.V. Barabash sent in blueprints of an invention to GABTU KA, titled "A mechanism for loading ammunition for the F-34 gun in the KV tank". A refined version of the invention was sent in in July of 1944. The invention came too late, but the concept was sound, and Barabash received a patent for his invention.

CAMD RF 38-11350-108

The text is too blurry to read the ammunition capacity, but it looks like 168 shells total. The device has two separate compartments, for AP and HE ammunition, which the operator of the device can select from.

In August of 1944, Barabash sent in his autoloader designs for the T-34. Sadly, his device was meant for the T-34-76, and not the T-34-85, so it was also not built.

CAMD RF 38-11350-109

The tank carried 122 76 mm shells. Like the KV version, the device has AP and HE in separate storage: 37 AP and 36 HE in the turret, and 49 more HE in the turret basket.

Friday, 1 November 2013

Beginnings of the D-25

After the IS-85 was selected from the original 4 IS prototypes (1-4, the 85 mm one being #3), its armament proved insufficient for a modern heavy tank, especially considering that the 85 mm gun was already available on the T-34-85 and SU-85. An upgrade was needed, and the A-19 122 mm corps gun model 1931/37 was chosen as a candidate.

"The experimental IS tank with a 122 mm gun (IS-3) is built on the base of the IS tank and differs from it in armament. Instead of the 85 mm D-5 gun, the 122 mm D-25 gun is used, the most powerful of all currently known foreign or domestic tank guns.

The D-25 has the ballistics of the model 1931/37 A-19 corps gun.

Characteristics of the D-25 gun
  • Muzzle velocity: 800 m/s
  • Shell mass: 25 kg
  • Muzzle energy: 833 ton-meters*
  • Caliber: 121.92 mm
  • Barrel length: 47 calibers
  • Maximum recoil length: 550 mm
The D-25 tank gun uses the following shells:
  1. Armour piercing
  2. High explosive fragmentation
  3. Concrete piercing
The D-25 is installed on the gun mount of the 85 mm D-5 gun in a slightly altered IS turret. The pinions are moved by 110 mm, leading to a slight change in the immobile armouring of the turret. The gun slit is enlarged. The periscope is moved forward, the ammunition rack is altered. The radio is moved to the turret bay in order to ensure proper operation of the screw breech. The rear machinegun is absent. 

*The muzzle energy of the 85 mm D-5 gun is 305 ton-meters, or 2.7 times less"
CAMD RF 38-11355-1702

So there you have it, both the IS-1 and IS-2 were an IS-3.